Industrial Development

Rail-served industrial development starts with the right plan.

From site selection and rail access feasibility to conceptual track planning, partner coordination, and potential infrastructure funding, B&H helps companies and communities evaluate practical paths for rail-connected growth across Steuben County and New York’s Southern Tier.

Site selection support Rail access feasibility Track concept coordination Economic development partners
More Than a Property List

Rail needs to be considered before the site plan is finished.

A parcel may look attractive on a map and still be difficult to serve by rail. Track geometry, grade, switching movements, railcar type, loading methods, utilities, truck circulation, drainage, and future expansion all affect whether a site can support an efficient rail operation.

B&H works with manufacturers, developers, site selectors, property owners, municipalities, engineering firms, and economic development organizations to identify those issues early—when there is still time to improve the plan.

The goal is not simply to place track on a drawing. It is to create a site and service plan that can support the freight, the facility, and the operation over the long term.
Different Paths to Rail

The right solution may not begin with new track.

Some projects need a greenfield rail-served site. Others can begin at an existing transload facility or adapt an established industrial property with nearby rail access.

Aerial view of an industrial development property in Wayland, New York

Greenfield development

Evaluate available land, facility placement, rail alignment, utilities, highway access, permitting, and future expansion before the layout is fixed.

Aerial view of the Coopers Plains rail-served transload facility

Existing rail and transload sites

Use established infrastructure to begin moving freight, test a lane, support near-term operations, or reduce the amount of new construction required.

Aerial view of a rail-served industrial property near Painted Post, New York

Industrial reuse and expansion

Review existing industrial buildings, former sidings, adjacent railroad property, loading areas, and opportunities to restore or expand rail access.

Project Path

Move from an early idea to an actionable development plan.

The exact process depends on the project, but strong rail-served developments generally answer the same core questions in a logical order.

01 / Define

Start with the freight.

Commodity, origins, destinations, volume, railcar type, handling, timing, and future growth.

02 / Screen

Compare locations.

Rail access, land, utilities, highway connections, buildings, service territory, and community fit.

03 / Test

Evaluate feasibility.

Alignment, grade, curves, switching, loading, storage, drainage, access, and preliminary operating needs.

04 / Coordinate

Engage the partners.

Railroad, owner, engineer, contractor, municipality, utility, agency, and economic development organizations.

05 / Advance

Build the next phase.

Detailed engineering, approvals, agreements, funding applications, construction planning, and service preparation.

Rail-Ready Means Operationally Ready

A useful site plan has to work beyond the property line.

Rail access is part of a larger transportation system. The site must support safe switching, loading, unloading, truck circulation, storage, employee access, utilities, maintenance, and the expected flow of materials through the facility.

✓
Commodity and railcar fitEquipment, loading method, capacity, and product needs.
✓
Track geometryConnection point, alignment, curves, grade, and clearance.
✓
Switching operationsCar capacity, movements, spotting, and access requirements.
✓
Truck and material flowRoads, pads, scales, warehousing, storage, and handling.
✓
Utilities and site conditionsPower, water, gas, drainage, grading, and property limits.
✓
Long-term flexibilityExpansion, additional tracks, storage, and changing volumes.
Southern Tier Corridor

Local industrial access with broader network connections.

B&H serves the Wayland–Cohocton–Bath–Coopers Plains–Painted Post corridor, with Norfolk Southern interchange at Painted Post and highway access through I-390, I-86, and I-99.

Wayland

Development-ready location

Industrial land with rail-development potential and convenient access to I-390 and regional utilities.

Cohocton

Railroad-owned opportunity

Potential transload and industrial-development options near I-390 and B&H’s operating base.

Coopers Plains

Established transload platform

Rail, warehouse, truck-scale, handling, and industrial capabilities near I-86 and I-99.

Painted Post

Class I connection

Industrial opportunity near B&H’s Norfolk Southern interchange and the I-86 / I-99 corridor.

Development Partners

Infrastructure, incentives, and approvals require coordination.

B&H can help connect a project with local industrial development agencies, municipalities, utilities, regional planning organizations, property owners, engineering firms, contractors, and relevant state or federal resources. Eligibility and funding are never guaranteed, but early coordination can make a project better prepared when opportunities become available.

Your Development Team

Bring the railroad into the conversation early.

Share the proposed location, commodity, origins and destinations, annual volume, railcar type, facility concept, timing, and any site plans already available. Jeff and David can help identify the first issues and the right next steps.

Jeff Bauman, Vice President of Sales and Marketing
Sales & Marketing

Jeff Bauman

Vice President of Sales & Marketing

Contact Jeff
David Prindle, Business Development Representative
Business Development

David Prindle

Business Development Representative

Contact David
Start the Evaluation

Have a site, expansion, or rail access concept to review?

Contact the B&H business development team before the property, building, roadway, utility, and loading plans are finalized. An early conversation can help determine whether direct rail service, an existing rail-served property, or a transload solution is the most practical starting point.